Airbus Defence and Space imagery captured on 11 August 2016 shows significant activity related to China's People's Liberation Army Navy (PLAN) projects at Dalian Shipyard, including the assembly of the country's first indigenous aircraft carrier (CV), the Type 001A, and the production of Type 052D guided-missile destroyers (DDGs).
The imagery shows that, with the addition of the bow section and other exterior components, the assembly of the Type 001A CV is nearly complete. Two of the component fabrication areas adjacent to the dry dock are largely clear of materials, indicating that work on the Type 001A hull is nearing an end. Few uninstalled components remain present, including the forward aircraft elevator.
via www.janes.com
It will take probably another year and a half of fitting out after launch before she's ready for sea, but it has been a remarkably quick build.
Leave a comment